Jump to content

redmarque

Member Contributer
  • Posts

    299
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by redmarque

  1. Strange..yawns and blinks.... it's 2015 erk! didn't see the thread bump... New years resolutions include getting this bike on the road for a UK summer! :cheerleader:

    I've been tied up with renovating my old house over winter.. .warmer weather soon please!

    Something to look at in the way of an update.. Honda RS250RW track fairing... i've added some mounting tabs and started the front subframe... Radiator is really too wide for the upper so now mounted veritcally with new hangers welded on.

    fairing2.jpg

    fairing3.jpg

    Happy New Year VFRD! :beer:

    • Like 3
  2. Have you conducted a pressure/leak test yet?

    Also feel like a nice anodize or at least an sliding bath is in order. :-)

    Nope - filler neck and breather still need welding on.

    Open to ideas on wjhat to do for a leak/pressure test? Anodising sounds like a good idea. Sliding bath? you been playing with rubber duckies and the soap again? :goofy:

  3. Something to look at.. started fabing the tank. i've calulated that it will hold about 10 litres.. will do for testing.

    tank_tack.jpg

    Underside will fit over the airbox nicely.

    tank_base.jpg

    Anybody recommend some type of isolation mounts?

  4. We need to collaborate and make many, many sets for all our VFR brothers and sisters around the world. :wink:

    Yes indeed we do :fing02: Some chamfering on the edges and black anodising and we'll be good to go.

    Here's the other side and a better shot of a plate.

    5gen_rearsets2.jpg

    5gen_rearsets.jpg

    Uses one of gear linkages that comes with the rearsets.

  5. i started designing some rearsets a long time ago.... well there's a fair amount of machining and design in a full set.. so I cheated..

    5gen_rearsets1.jpg

    Adaptor plates... keep it simple and allow any cbr600rr rearsets to be used. these are from uk gbmoto.

    I need to machine another set with the mounting holes more upright.

  6. Hmmm... apologies all - I hadn't seen that anyone had posted to this thread this year till this morning!

    Some progess..

    I've moulded a rudimentry airbox as a standard one wouldn't fit between the frame rails. filtering is going to be minimal... stainless steel mesh maybe a thin layer of foam.

    airbox_fibre1.jpg

    airbox_fibre2.jpg

    All of the electrics are mounted under the seat plate apart from the tilt switch sensor. Fibreglassed a holder for the LiFe Po4 battery.

    life_battm.jpg

    Having read the COP thread yesterday. i've pulled the trigger on some late model GSXR 750/600 coil sticks - getting rid of those traditional coils and leads will be great with such limmited space.

  7. Agghhh! You got me there Seb! Yep there's some progress... slow progress but something to look at!

    gallery_12018_6177_52130.jpg

    Coils mounted... has anyone worked out if a coil-on-plug setup works yet?

    gallery_12018_6177_129231.jpg

    airbox plug nearly ready for fibreglass - i've moulded this now but haven't taken any pics of it yet.

    gallery_12018_6177_23599.jpg

  8. Ok, I didn't know what your budget was but I thought £500ish was a good price for a custom built tank.  

    The TL looks great.  I wonder if it's for sale, it would be ideal for my commute :)

    Wish I had more funds to indulge my hobby further :blush:

    Yeah that TL would be a hoot though morning traffic... V-twin booming and hiss of waste gate to intimidate the car drivers! :fing02:

  9. Ah, Now I understand what you're getting at!

    Your reasons for concern are valid and I thank you for pointing out a possible issue.

    Having re-evaluated the design and discussed with my engineer/welder friend i’ve come to the conclusion that if there were only 2 spreading bars I would agree that more triangulation would need to be added. The design has four connecting struts to front and rear of the fork all of which are angled to transmit the loads.

    Look at this Vincent girder fork for example; which has only 2 legs. Instead of round tubes it utilises a thick plate to perform a similar function. Also note the material (mild steel) and section/thickness of the fork legs compared to my Hossack design.

    black-shadow-girder.jpg

    I will be keeping a close eye on all the frame and forks for any signs of fatigue once testing begins. My sense of life preservation is VERY strong!

  10. I know you were intending to fabricate a tank and use a CBR tank cover, but it might be worth getting in touch with these guys and have an alloy tank made.  At least you know it would be watertight (or petroltight) and it would take your weight when you hang off the bike.

    Hey those tanks are sure pretty and unfortunatly expensive! As this is a prototype that I don't even know if it will work yet; I thought it best to make things functional first and aesthetic second.

    This mad supercharged TL1000 built for hillclimbing has simular idea to what i'd planned to use. - without the supercharger/plenum :wub:

    150520101002.jpg

    150520101004.jpg

    :offtopic: Apparently it makes over 200BHP and looks the business!

  11. Thanks Larry :fing02:

    I'm not really sure what you mean - i don't understand your description of the issue. :blush:

    i've decided not to spend $$ modifiy the engine until everything else is complete. If the bike handles well then i'll certainly look into more power.

    Working on the steering/handlebar mounting atm.. wil post pics when more parts are finished.

  12. Backup from welders! Test fitted frame on motor with scrap mounting plates.

    A few modifications to the position will be needed to align rear shock and upper front a-arm.

    frametestfit.jpg

    Fork came out rather well :cheerleader: Nice welding - will need some mild heat to get both calipers to line up correctly.

    forktestfit.jpg

  13. Yep, it's going to be a challenge.. fortunately not for me though! I'm hiring the same guy whom did the welding on Mk1. After all this effort and accuracy I don't trust myself!

    The front parts of the legs and ajoining tubes aren't tacked on yet, so that the rear legs can be welded first.

×
×
  • Create New...

Important Information

By using this site, you agree to our Privacy Policy.