BrianF Posted May 21, 2015 Share Posted May 21, 2015 Alrighty misfits and malcontents - it's time to plan ahead for once.Last year we (and by "we" I mean people other than me who weren't injured in dirtbike crashes) got the Golden State Gathering off the ground in earnest. This time I'd like to give people plenty of time to think ahead.After a discussion with those who actually made it in 2014, we chose the 29th and 30th of August as the dates - PLEASE LET ME KNOW ASAP IF THOSE DATES DON'T WORK FOR YOU. If enough people can't make it we'll try to find alternatives.The other vote you get is how the gathering is run: either point-to-point with an overnight stop, or basecamp with loop rides each day.For example:Point-to-point (meeting in Kernville): Day 1 https://goo.gl/maps/0Gx0S, Day 2 https://goo.gl/maps/Bry0HBasecamp: Day 1 https://goo.gl/maps/gRNyZ Day 2 https://goo.gl/maps/PBxyNObviously these are not final, but just to give you an idea. I personally am much more fond of the point-to-point option, but I know it makes it tough on the SoCal guys.Thoughts? Opinions? Objections? Feedback ready go.In (NorCal):BrianFecnCrazyBro St. Stephen TJ tc339 In (SoCal): duc2V4 In (Nevada): RichVee4 Link to comment Share on other sites More sharing options...
Member Contributer crazybrother Posted May 21, 2015 Member Contributer Share Posted May 21, 2015 Hmmm, I wonder what bike i'll have then... Either way, i'm in. Link to comment Share on other sites More sharing options...
Member Contributer Duc2V4 Posted May 21, 2015 Member Contributer Share Posted May 21, 2015 I'm liking both options and if I end up being the only So Cal rider again and the group wants to do the P to P rides, I'll be game for it! Link to comment Share on other sites More sharing options...
Member Contributer RichVee4 Posted May 22, 2015 Member Contributer Share Posted May 22, 2015 Looking forward to it! Aug 29 and 30 works best for me. I would need to do some type of point to point on Sat to start heading back North toward Reno. Liking the maps for Day 1. Link to comment Share on other sites More sharing options...
Member Contributer St. Stephen Posted May 25, 2015 Member Contributer Share Posted May 25, 2015 Sounds good, I'm in! August 29th & 30th work. I would prefer the point-to-point but am flexible if that makes it difficult for others. Link to comment Share on other sites More sharing options...
tjclyde Posted May 25, 2015 Share Posted May 25, 2015 I'm in. Tj. Link to comment Share on other sites More sharing options...
tc339 Posted May 26, 2015 Share Posted May 26, 2015 Im in. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.